Client: The city of Białystok
- General Contractor: Przedsiębiorstwo Robót Elektrycznych i Budowlanych „MIPA” Leon Stankiewicz
- Time limit for performance: 07.06.2011 - 15.06.2012
Scope of Works:
The construction of a rail bridge under track 1 of railway line No. 037 at km 4.613:
- viaduct with an overall length of 55.20 m and width of 23.0 m;
- earthworks;
- strip footing;
- execution of RCC wings and abutments;
- execution of an RCC deck bonded with steel superstructure;
- setting of bearings;
- setting of hydraulic damping devices;
- execution of modular expansion joints;
- viaduct draining;
- waterproofing with torch-on membrane;
- setting of elevation markers;
- finishing works.
Redevelopment of the culvert on Dolistówka River along Piasta Street:
- bridge with an overall length of 15.0 m and width of 19.70 m;
- demolition works;
- earthworks
- prefabricated pile driving (40x40 cm; length: 8.0m;
- execution of a reinforced concrete structure;
- waterproofing with torch-on membrane;
- bridge draining;
- setting of bearings;
- execution of expansion joints;
- finishing works.