Client: General Directorate for National Roads and Motorways - Łódź branch
- General Contractor: SRB Civil Engineering Ltd., John Sisk&Son Ltd., Roadbridge Ltd., Budbaum S.A.
- Time limit for performance: 30.09.2010 – 14.08.2012
Scope of Works:
- Bridge works on the following facilities: WD(T) 181A, WD(K) 181, WD(K) 181B, WD(G) 182, WD(G) 182A, WD(Z) 183, WD(G) 184, E6, WD(G) 185, E7
- earthworks (excavations and fills);
- ground stabilisation under foundations with DSM columns (WD 181A);
- sheet piling and extraction of sheet pile walls;
- large-diameter piles (phi 1200);
- prefabricated piles;
- load tests of piles;
- reinforcement of monolithic structures;
- monolithic structures: foundations, abutments, intermediate piers, transition slabs, structural concrete footway slabs in panel formworking;
- monolithic deck structures;
- cable-laying and structure prestressing;
- sheet-membrane waterproofing and thin waterproofing;
- gussasphalt pavements;
- bridge draining;
- delivery and assembly of bearings, MEJs and asphaltic expansion joints;
- setting of kerbs, combination railing, guardrails and parapets;
- slope stabilisation;
- concrete surface treatment;
- load tests of the facilities.