General Directorate for National Roads and Motorways - Białystok branch

  • General Contractor: Przedsiębiorstwo Drogowo-Mostowe Białystok S.A.
  • Time limit for performance: 10.11.2004 – 31.08.2005r.

Scope of Works:

  • MULTI PLTE L14 structures (pipe-arched culverts) – 67 linear meters;
  • corrugated steel culverts (circular cross-section), ø 1200 mm, HEL-COR – 65 m;
  • corrugated steel culverts (circular cross-section), ø 1400 mm, HEL-COR – 33 m;
  • corrugated steel culverts (circular cross-section), ø 1600 mm, HEL-COR – 23 m;
  • placement of SP 09 traffic barriers, 8,086 meters.

Charakterystyka obiektu

  • element wartość m2