Client: General Directorate for National Roads and Motorways - Białystok branch

  • General Contractor: Budimex Dromex S.A.
  • Time limit for performance: 20.04.2004 – 31.05.2005r.

Works performed:

  • preparatory works, including soil stripping and disassembly works;
  • earthworks – excavations and fills;
  • corrugated steel culverts (pipe-arch section), L11 – 44 m (2 pcs.);
  • corrugated steel culverts (pipe-arch section), L14 – 59 m (2 pcs.);
  • corrugated steel culverts (pipe-arch section), L50 – 53 m (2 pcs.);
  • corrugated steel culverts (circular cross-section), ø 1000 mm – 181 m (7 pcs.);
  • corrugated steel culverts (circular cross-section), ø 1400 mm – 27 m (1 pcs.);
  • corrugated steel culverts (circular cross-section), ø 1600 mm – 69 m (2 pcs.);
  • finishing works: protection of slopes, ditches and drains.